Menu
Campus Clayton

Campus Clayton

Project Overview
  • Project Campus Clayton

  • Builder L U Simon Builders

  • Architect Plus Architecture

  • Location Clayton, Victoria

  • Framing Used SBS Smart Frame / Pre-Fabricated Balustrade Framing

Campus Clayton; a recently completed apartment development again showcased SBS smarter framing solutions for the industry. With a diverse range of architectural balustrade designs, SBS Group were called upon to provide a simple and efficient pre-fabricated alternative to what was originally documented. The SBS in house design and engineering team were able to provide a streamlined, easy to install system, offering the added advantage of direct fixing of cladding materials.

 

The existing design of traditional structural steel and top hats was superseded and replaced with the SBS Smart Frame balustrade system. Frames were shop detailed, pre-fabricated and supplied to site with an easy fix bracket system resulting in a superior substitute. Cladding was then quickly attached and painted with hand rails following. This resulted in an extremely fast and productive solution to the builder’s request.

Map-Image