Menu
Hendrix Apartments

Hendrix Apartments

Project Overview
  • Project Hendrix Apartments

  • Builder May Constructions

  • Architect Ascui and Co Architects

  • Location Brunswick, Victoria

  • Framing Used SBS Smart Frame / Pre-Fabricated Wall Panel Framing

Located on a tight construction site, the challenge was to find an easier alternative than a traditional on site facade construction.

 

SBS Group proposed a smarter pre-fabricated wall panel framing system. Frames were shop detailed, engineered and manufactured with cladding directly fixed at our factory prior to delivery.

 

With framing layouts supplied by SBS Group, the lightweight modules were quickly lifted into position and fixed off. As a result, the entire facade was constructed without the traditional scaffold.

 

Weather, RDO set-backs and working around other trades are often factors that threaten to hold up a project schedule. By taking the majority of the facade construction off site, these potential delays were minimised for an on time productive outcome.

Map-Image