Menu

Latest News

Continuing the Build Smarter Approach at Ego Pharmaceuticals

17 August 2016

With all frames now delivered to site for the Ego Pharmaceuticals project, it’s now over to the contractor on site to manage the installation. A recent visit to site shows that significant progress is being made with cladding of the steel frames also underway.

In coordination with the architect, SBS Group created a pre-fabricated system for the external facade and features. The SBS Smart Frame solution has resulted in faster, easier and smarter approach to constructing the facade by replacing a traditional timber or structural steel system with a light gauge steel framing alternative.

Find out more about the project >

Ego - 1

Ego - 2

Smart construction starts with smart designs. Find out how the SBS Build Smarter system is transforming traditional time-consuming construction methods into time-saving solutions by downloading our Company Profile:

Project Reports

BE THE FIRST TO HEAR ABOUT OUR BUILD SMARTER NEWS
Sign up to receive notifications about our latest videos, case studies, projects and product updates