Menu

Latest News

A Forward Thinking Pre-Fabrication Advantage for The Cornerstore Apartments

24 May 2016

QUICK PROJECT FACTS

Project / The Cornerstore Apartments

Architect / Map Architecture

Developer / Cozzello Family + Preview Property

Builder / Hamilton Marino

Location / 103-111 Dundas Street, Preston

Floor Level / 4

Number of Dwellings / 56


SBS Scope of Works / Pre-fabricated external screen, balustrade and feature framing

Details / SBS Group was approached to analyse the project and create alternative construction methods to replace structural steel where possible.

SBS recommended pre-fabricating frames as full units with triangular feature framing included as part of the balustrades where practical – reducing the number of lifts and installs required for significant on site time and cost saving advantages. The system also enables direct fix of cladding with all framing shop detailed in house and engineered to 1507 certification.

Image_Courtesy_thecornerstoreapartments.com.au_2

Image_Courtesy_thecornerstoreapartments.com

Scope_of_Works Scope_of_Works_2


Pre-Fabrication. The way forward for maximising productivity by reducing labour, associated costs and on site inefficiencies.

Prefabrication. The Way Forward Image.

Download the free guide to find out more >

Project Reports

BE THE FIRST TO HEAR ABOUT OUR BUILD SMARTER NEWS
Sign up to receive notifications about our latest videos, case studies, projects and product updates