Menu

Latest News

Archives

  • TOTAL L/M OF STEEL FRAME SUPPLIED / 3640.8   TOTAL M2 OF SBS GROUP FOOTPRINT AREA / 1142.58   FLOOR COUNT / 1   KEY BENEFITS OF USING AN SBS GROUP LIGHT GAUGE STEEL FRAMING SYSTEM / >  The SBS Group team designed, detailed, fabricated and delivered infill wall frames for the new modular building. >  Framing was manufactured to precise measurements in coordination with the building structure. >  Installation was fast and easy as frames using steel materials do not bow, twist or warp. >  Compared to the cost…

  • TOTAL L/M OF STEEL FRAME SUPPLIED / 4321.84   TOTAL M2 OF SBS GROUP FOOTPRINT AREA / 940.22   FLOOR COUNT / 1   KEY BENEFITS OF USING AN SBS GROUP LIGHT GAUGE STEEL FRAMING SYSTEM / >  When the goal is to speed up construction, pre-fabrication is the answer. >  Internal wall framing was designed, shop detailed, manufactured and delivered to site in coordination with the contractor’s schedule. >  The ease and speed of install saved the construction teams a week of labour on site. >  Framing was fabricated…

  • In the builder’s own words: “A controlled prefab system; quick, strong, easy fixing and accurate with straight, plumb and level walls.”   TOTAL L/M OF STEEL FRAME SUPPLIED / 7403   TOTAL M2 OF SBS GROUP FOOTPRINT AREA / 466.48   FLOOR COUNT / 2   KEY BENEFITS OF USING AN SBS GROUP LIGHT GAUGE STEEL FRAMING SYSTEM / >  To speed up the project schedule, light gauge steel framing was identified as the fastest system to install. >  Wall, joist and roof truss frames were easily fixed off using…

  • TOTAL L/M OF FRAMING SUPPLIED / 18817.3   TOTAL M2 OF SBS GROUP FOOTPRINT AREA  / 450.98   FLOOR COUNT / 2   KEY BENEFITS OF USING AN SBS GROUP LIGHT GAUGE STEEL FRAMING SYSTEM / >  The level of detail originally provided for the timber system was minimal and challenging to understand. Using steel allowed the carpenter to handball the framing redesign to SBS Group. >  SBS Group coordinated the entire design process including 3D modelling, shop drawings, layout plans and engineering certification. >  Straight, true and accurate framing…

Project Reports