  • In the builder’s own words: “A controlled prefab system; quick, strong, easy fixing and accurate with straight, plumb and level walls.”   TOTAL L/M OF STEEL FRAME SUPPLIED / 7403   TOTAL M2 OF SBS GROUP FOOTPRINT AREA / 466.48   FLOOR COUNT / 2   KEY BENEFITS OF USING AN SBS GROUP LIGHT GAUGE STEEL FRAMING SYSTEM / >  To speed up the project schedule, light gauge steel framing was identified as the fastest system to install. >  Wall, joist and roof truss frames were easily fixed off using…

  • TOTAL L/M OF FRAMING SUPPLIED / 18817.3   TOTAL M2 OF SBS GROUP FOOTPRINT AREA  / 450.98   FLOOR COUNT / 2   KEY BENEFITS OF USING AN SBS GROUP LIGHT GAUGE STEEL FRAMING SYSTEM / >  The level of detail originally provided for the timber system was minimal and challenging to understand. Using steel allowed the carpenter to handball the framing redesign to SBS Group. >  SBS Group coordinated the entire design process including 3D modelling, shop drawings, layout plans and engineering certification. >  Straight, true and accurate framing…

  • TOTAL L/M OF STEEL SUPPLIED / 9200.46   TOTAL M2 OF SBS GROUP FOOTPRINT AREA / 690.5   FLOOR COUNT / 7   KEY BENEFITS OF USING AN SBS GROUP LIGHT GAUGE STEEL FRAMING SYSTEM / – Careful attention to detail during the design phase enabled immediate, easy and streamlined installation. – No straightening of walls as steel does not rot, twist, warp or shrink. – Steel frames were fabricated to exact site specifications, reducing on site adjustments and material waste both in the factory and on site. – Full…

  • Today’s construction industry is fast paced. Smarter ways of building are essential in keeping up with demand, project deadlines and staying on budget.   When it comes to the construction of top level framing for mid-rise apartment projects, cold formed steel wall and roof trusses are becoming the preferred choice for many builders. The advancements in cold formed steel framing offers competitive solutions with savings achieved in many ways.   The SBS Group lightweight and high strength engineered framing system replaced the traditional timber and structural steel for this 5…

Project Reports