Menu
Highton Primary School

Highton Primary School

Project Overview
  • Project Highton Primary School

  • Builder Prebuilt Pty Ltd

  • Architect Brand Architects

  • Location Highton, Victoria

  • Framing Used Infill Wall Framing

TOTAL L/M OF STEEL FRAME SUPPLIED / 3640.8

 

TOTAL M2 OF SBS GROUP FOOTPRINT AREA / 1142.58

 

FLOOR COUNT / 1

 

KEY BENEFITS OF USING AN SBS GROUP LIGHT GAUGE STEEL FRAMING SYSTEM /
>  The SBS Group team designed, detailed, fabricated and delivered infill wall frames for the new modular building.
>  Framing was manufactured to precise measurements in coordination with the building structure.
>  Installation was fast and easy as frames using steel materials do not bow, twist or warp.
>  Compared to the cost of conventionally stick building the walls, the prefab system was a more competitive and productive alternative.

Map-Image