Skip to main content Call 1300 782 950
Mercy Health Aged Care – Stage 2

Mercy Health Aged Care – Stage 2

Project Overview
  • Project Mercy Health Aged Care – Stage 2

  • Builder Hutchinson Builders

  • Architect ThomsonAdsett

  • Location Montrose, Victoria

  • Framing Used Roof Truss Framing

THE PROJECT CHALLENGE / Assist the site teams with a fast solution for the fabrication and installation of roof truss framing.

 

THE SBS STEEL SOLUTION /

> Frames were designed, detailed and fabricated in-house for a streamlined all-in-one system, using 3D CAD integrated technology.
> Lightweight yet strong, steel trusses are easier to handle, and fast to install once on site.
> Layout plans and a clearly marked frame labelling system assisted with the speed of erection.
> Consistent service and trade coordination with the installers and site teams was key to ensuring there were no delays to the project schedule.

 

TOTAL L/M OF STEEL FRAME SUPPLIED / 4715

 

TOTAL M2 OF SBS GROUP FOOTPRINT AREA / 725.13

 

FLOOR COUNT / 3

 

Map-Image