Menu
SUR Apartments

SUR Apartments

Project Overview
  • Project SUR Apartments

  • Builder Buildcept

  • Architect Tom Robertson Architects

  • Location Moonee Ponds, Victoria

  • Framing Used SBS Smart Frame / Pre-Fabricated Top Level Wall and Roof Truss Framing

Today’s construction industry is fast paced. Smarter ways of building are essential in keeping up with demand, project deadlines and staying on budget.

 

When it comes to the construction of top level framing for mid-rise apartment projects, cold formed steel wall and roof trusses are becoming the preferred choice for many builders.
The advancements in cold formed steel framing offers competitive solutions with savings achieved in many ways.

 

The SBS Group lightweight and high strength engineered framing system replaced the traditional timber and structural steel for this 5 level project. All stages of the Build SmarterTM process were coordinated from initial design through to in-house detailing, modelling, engineering, fabrication and delivery.

 

Frames were manufactured to suit exact specifications and for easy installation. This reduced the amount of waste on site and extensive labour that is usually required for stick building methods. As steel requires less maintenance compared with timber, it is not susceptible to moisture, pest or termite damage. This is another major advantage for the builder and client owner.

Map-Image