The Royton

The Royton

Project Overview
  • Project The Royton

  • Builder DCS Built

  • Architect SilverPoint Building Designers & Planning Consultants

  • Location Burwood East, Victoria

  • Framing Used Top Level Wall & Roof Truss Framing

THE PROJECT CHALLENGE / Build the top level structure within a tight construction timeframe.

 

THE SBS STEEL SOLUTION /

> The pre-fabricated framing system replaced a traditional timber stick build approach, combining multiple packages into one.
> SBS Group undertook the full design, detailing, engineering, fabrication and delivery of the lightweight steel frames, working to the project design and builder’s schedule.
> Careful attention to detail in the shop detailing stage was evident with frames fabricated straight, true and accurate. No further straightening or planning was required once frames were installed, saving significant time on site.
> The frames were clearly labelled and supplied with detailed layouts for an efficient and streamlined install.

 

TOTAL L/M OF STEEL FRAME SUPPLIED / 5,756

 

TOTAL M2 OF SBS GROUP FOOTPRINT AREA / 515.46

 

FLOOR COUNT / 3 + Basement

 