Tribeca Village Townhouses

Tribeca Village Townhouses

Project Overview
  • Project Tribeca Village Townhouses

  • Builder Empire Properties

  • Architect ClarkeHopkinsClarke

  • Location Point Cook, Victoria

  • Framing Used Multi-Level Wall, Joist and Truss Framing

THE PROJECT CHALLENGE / Design and deliver an alternative framing system for 58 townhouses, supporting the construction teams with their first steel frame project.

 

THE SBS STEEL SOLUTION /

> A reliable supplier that would consistently go above and beyond to deliver a quality product, on time and on schedule was a must for the developer.
> Significant structural steel was removed from the original design, and as light gauge steel has a high strength-to-weight ratio, the proposed large spans were easily achievable.
> Frames were detailed, engineered and fabricated using 3D CAD integrated technology for accurate, true and straight results.
> To assist the site teams with installation, and adjusting from a timber to steel system, site response and support was provided throughout the entire build.
> The ability to accept challenges as they arose and quickly adapt resulted in a strong alliance between both teams, with the developer embracing steel as the smarter way to build.

 

TOTAL L/M OF STEEL FRAME SUPPLIED / 206,645

 

TOTAL M2 OF SBS GROUP FOOTPRINT AREA / 10,702.29

 

FLOOR COUNT / 2

 